Minutes of the Meeting of the
Village Facilities Committee, Thu 7 Sep 2006,
Brampton Memorial Centre, 7.30pm
|
Present: |
P Downes (Chairman), M
Shellens, Mrs L Ruston, S Jordan, Mrs
B Leighton, J Innes-Clarke, Clerk |
|
|
|
|
|
|
1 |
Apologies: NM, KW,
JK, MW, SM for absence, MS for lateness |
|
|
|
|
|
|
2 |
To Approve as a correct record, minutes of the meeting, 31 Jul 06 |
|
|
Proposal: |
Approve 1st
LR, 2nd BL |
Carried |
|
|
|
|
|
3 |
Matters Arising from those
minutes |
|
|
3.1 |
3.1 3 x barriers @ PF
entrances have been installed issue over motorised wheel chairs check
with Manor residents |
BL |
|
3.2 |
3.4 radiators hot to touch in
Comm Ctr check with user group carry forward |
SM |
|
3.3 |
3.6 separate cubicles in 1 x
shower room for ladies inspected with M East nothing on specs for
this M East to price up for curtained cubicles to 1 x room and advise
|
|
|
3.4 |
3.10
ground environs, Comm Ctr grounds staff have pruned back trees, removed
weeds and cement filleted cracks in ground, either side of front door.
Awaiting Community Services to decorate scheduled for early Oct |
|
|
3.5 |
3.11
baby changing unit, Comm Ctr check with user await call back Note
since meeting: user requests we ask our contractor to install when work to
meeting room is being done |
|
|
3.6 |
3.12 T
Burnely advises it is a photo display required not a trophy cabinet he is
working on a design for a photo display, to go on wall immediately on left as
you enter Community Room |
|
|
3.7 |
12 cleaning at high level in
Comm Ctr now done |
|
|
|
|
|
|
4 |
Young People and Vulnerable
Adults Protection Policy |
|
|
|
Amendments to first draft done,
to go to PC 20 Sep final check to 2nd draft |
SM |
|
|
|
|
|
5 |
CCTV |
|
|
5.1 |
Monitoring from HDC went live 17
Aug feedback from Frank Cannon: ·
59 activations during Aug, most were nothing, 1 or
2 were where someone was close to building but nothing to warrant their
control room taking further ·
Monitoring is not putting any extra burden on
Control Room staff |
|
|
5.2 |
Consider a voice warning when
the beam is broken investigate costs, advise next VF |
JIC |
|
5.3 |
Operator signage at front gate
outstanding to incorporate with car park signage |
JC |
|
|
|
|
|
6 |
Memorial Centre |
|
|
6.1 |
Booking rate enquiry KFA
training day apply Rate 6 commercial booking |
|
|
6.2 |
User satisfaction survey draft
questionnaire & covering letter tabled approved - proceed to issue |
|
|
6.3 |
Bookings Clerk to monitor the
above returns |
|
|
6.4 |
Windows opening wide creating
hazard to people walking around building: a) Punch-in
channel to prevent hinges from opening wide b) Remove 1st
row of slabs round building where there are windows & plant low level,
low maintenance shrub beds, which will prevent people from being able to walk
close to open windows, action: |
|
|
|
Proceed with b) retain slabs
to use at Sk8 Pk entrance gate, west fence and at service gates instruct
staff |
JIC |
|
6.5 |
Footballs against windows
constant and deliberate, windows always being cleaned consider re-installing window grills |
|
|
|
No to grills as they allow a
foothold onto roof install notice No Ball Games against building |
JIC |
|
6.6 |
Snagging is complete await
sign-off from architect Total redec was required for
Community Room PC contribution is £200 |
|
|
6.7 |
Marketing: ·
Updated flier tabled proceed, soften photo of
building if possible ·
Article booked for next edition of District Wide
cost to be advised ·
Also contact Business Link and Federation of Small
Businesses ·
Phase II leave until feedback received from Phase
I ·
Ask Town Crier to do article |
JIC/JB JB JB JB |
|
|
|
|
|
7 |
Playing Fields |
|
|
7.1 |
FA goal
post replacement scheme our application has been submitted to Hunts FA for
3 x replacement steel sets £742.50 total, 50% contribution from PC is
£371.25. Hunts FA
have now forwarded to FA timescale for outcome: between 2 wks to 2 months |
|
|
7.2 |
Safety issues with stake holes from cricket square NM suggests
cutting sections of copper pipe to use as sockets
|
JIC |
|
7.3 |
Training area PD to attend Biffaward 8 Sep re: available
grant aid outcome dependent on survey results after next issue BM |
|
|
7.4 |
Vandalised benches KW asks why we are only replacing 1 x bench with new when our insurance excess is £100 whether we replace 1 or 2 KW would like to see both benches replaced similar to new one installed near MC Replace both benches, + salvage
re-useable materials to repair 1 x bench, 1 new bench to be installed along S
wall of MC |
JIC |
|
7.5 |
Quick drop
goal post sockets 1 x cover missing + 1 x socket bent probably vandalised
renew sockets
|
JIC |
|
7.6 |
Request to
hold car boot sale, located on 75% of training area on a Sun morning, date
TBA.
Invite to view area on a Sun issue whether there will be
enough room after parking from football and Martial Arts |
JIC |
|
7.7 |
Disturbance to
cricket match during Aug last match this season is next Sun 10 Sep, action:
·
erect signed notice
onto Sk8 Pk fence to remind users of closure during
matches
·
PD will be available during the match |
|
|
7.8 |
Gravel outside
workshop now replaced with concrete
|
|
|
7.9 |
Hardstanding
& fencing for equipment new drawing/requirements from groundstaff were
discussed, action: seek further alternatives
|
JIC |
|
|
|
|
|
8 |
Byelaws |
|
|
|
Example
byelaws were discussed in detail: |
|
|
8.1 |
Approve
an area for Bar B Qs design for which, to be carried forward |
|
|
8.2 |
Part 3,
horses, cycles and vehicles add dogs |
|
|
8.2 |
16 delete cycles
|
|
|
8.3 |
23 ball games add d) no ball games
against building
|
|
|
8.4 |
24 delete cricket
|
|
|
8.5 |
Amend doc, email to JIC to circulate
before PC 20 Sep
|
PD |
|
|
|
|
|
9 |
Skate Park |
|
|
|
Grounds staff to slab area in front of service gates and
west pedestrian gate slabs supplied from those to be removed from 1st
row around MC wdow walls (see 6.4 above) |
|
|
|
|
|
|
10 |
Play Areas |
|
|
10.1 |
Annual inspections and risk assessments actions ongoing
trip hazards to tiles done |
|
|
10.2 |
Display 4 x
proposals to go to schools to survey preferences all 4 around same costs
Members examined the proposals, action: write to both
schools to ask if they can undertake the survey and in what format. Funding: 50% contribution from section 106 money, Feltwell
development |
JIC |
|
|
|
|
|
11 |
Community Centre |
|
|
11.1 |
PD & NM had met to discuss
best use of back room drawing tabled 2 x quotes received for work as
per drawing: a) Recommended
Interiors - £3,470 + VAT total £4,077 b) T D
Services - £4,750 |
|
|
Proposal: |
Proceed with a)
to be ratified by PC
|
PC |
|
11.2 |
Liaise with
user group over limited storage
|
MS |
|
11.3 |
Community
Services work to front exterior rescheduled early Oct
|
Noted |
|
|
|
|
|
13 |
Date of next Meeting |
|
|
|
Mon 13 Nov
(NB. Moved from original date of 20 Nov)
|
|
|
|
|
|
|
|
|
|
|
|
__________________________
|
|
|
|
Peter
Downes, Chairman
|
|